Many Buildings in BMC (B,C,E) Ward Are Re-Constructed Under the Pretext of Repairs And Almost Vertically Unauthorized Manner Extension Also Running In Full Swing
Many Buildings in BMC (B,C,E) Ward Are Re-Constructed Under the Pretext of Repairs And Almost Vertically Unauthorized Manner Extension Also Running In Full Swing
Sources said Ganesh Thakur Sub Engineer Building and Factory Department Supporting illegal Constructions in BMC C Ward.
Illegal Constructions is Going on in Lockdown.
Sources Says Those who are doing illegal Constructions doesn’t fear BMC and Corporators. They boastfully say we have manage both of them and we have high Contacts.
According to Sources Ganesh Thakur Sub Engineer Building and Factory boast that
Assistant Commissioner C Ward Chakkar Pani Ile and DMC Zone 1 Harshad Kale hands are on My head and there is no Tension.
State Government Should Suspend C Ward officials for not taking any action against an illegally constructed building in C Ward. BMC C Ward officials only send Notices but does not Demolish illegal structures.
Sometimes If anybody Files a Complaint, they Demolish the Structure Temporarily but later the construction continues. The violators are aware about the type of facts to be presented in court to get a stay in which the Civic Officials are involved.
There is Strong Connivance Between the Occupants, the Ward Office, and the Local Police Station for illegal Constructions and Commercial Activities.
The Problem of illegal Encroachment in the city is now Reaching Dangerous proportions. The only solution is that a robust system needs to be put in place.
A Mechanism has to be set up and the monitoring be done by an IAS ranked officer. Every year these matters come to light when a Building Collapses and then the Officer’s Conveniently Forget about them. All this Needs to Change.
(1) Valiulla Tower Nagdevi Street (B) Ward
Unauthorized 4 Floor’s
(2) 82, Zubeda Castle NARAYAN Dhuru Street, Unauthorized 2 Floor’s
(3) City Heights Khadak B Ward. Unauthorized Landfilling
(4) 56, Karim Building Khokha Bazar B ward. Unauthorized Construction Was Carried
(5) 2/4/6 Narayan Dhuru Street B Ward. Unauthorized Without Authorisation Permission ic/oc/iod/cc
(6) 1st barya Building Opposite B Ward. Illigal Metro Lift Fitted
More Details Will Be Flash’s Soon
Many Illigal Construction Work Details Will Be Expose Soon,Many Transfer and Suspension Will Soon be into Notice,This Article Is Purely In The Interest Of Public Notice/ Awareness
Warm Regards,
Warees Ali Sayyed
INTERNATIONAL HUMAN REIGHTS COMMISSION
REGIONAL COORDINATOR INDIA
UID:V1016CZ/EU20
THE YELLOW PRESS INTERNATIONAL REPORTER
REG/COM/IND/1841231/Sayyed, Warees Ali@YELLOWPRESS
Warees Ali Taibani (Sayyed) Crime Reporter
EKHABAR PRESS
EMP:ekr/R/2012
Mumbai Maharashtra
Mobile No 8779857891
Stay Tuned For More Details Related To Illigal Construction/ Unauthorized Manner Constriction Work/ Change of user/ Illigal Vertical Extension/Horizontal Extension/Refujee Floor’s Into Flats/FSI Residence Violation/FSI Commercial Violation.ETC
In Covid 19, people from all over the world have lost but as many land mafia and illegal construction builders as in A, B, C, D, E Umer Lakdawala Apna Ward Do what I want to do, because the MMRDA & MCGM Authority of South Mumbai is busy Because To Save People’s Of Their Ward, So take advantage of this current situation and do whatever you want to do I’m here no odd fear